Skip to product information
1 of 14

NEW PRODUCT | LOW STOCK

Winsome Suzanne Space Saver Set, for Kitchen, 33", Coffee

Winsome Suzanne Space Saver Set, for Kitchen, 33", Coffee

Regular price $259.99
Sale price $259.99 Regular price $518.99
Sold out

Winsome Suzanne Space Saver Set, for Kitchen, 33", Coffee

Regular price $259.99
Sale price $259.99 Regular price $518.99
Sold out
  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Klarna
  • Maestro
  • Mastercard
  • Shop Pay
  • Union Pay
  • Visa

1-2 Days delivery

Brand: Winsome

Color: Coffee Finish

Features:

  • Dimensions (W x D x H): 29.61 in x 29.13 in x 32.75 in
  • Drop Leaf to expand table size | Stools tuck neatly under the table
  • Set rolls easily on casters
  • Two drawers with cut-out handles
  • Made of Solid and Composite Wood
  • Included Components: Table, Stools

Binding: Kitchen

Release Date: 02-05-2018

model number: 23330

Part Number: 23330

Details: This inviting 3-Piece Space Saver Set will bring ease and versatility to dining in your kitchen, breakfast nook, or den. A drop leaf supported by a swing-away leg with a 5th rolling caster can be opened to create a dining table for two. Or lower the drop leaf, stow the stools, and roll the unit into the corner to create more open space. The sturdy hideaway stools have smooth, broad seat tops with rounded corners and can be tucked neatly under the table for a compact footprint. Two drawers with cut-out handles are ideal for silverware, napkins, and placemats. And the push handle also serves as handy place to hang a kitchen towel. Rolling casters, two of which lock to keep the unit stable while in use, allow for easily mobility. Made of solid and composite wood in a sleek Coffee Finish. Table Height: 32.75'H Tabletop dimensions (with leaf open): 27.3'W x 29.6'D (with leaf lowered): 27.3'W x 15.4'D Push handle adds 2.25' to overall width Drop leaf dimensions: 27.3'W x 14.8'D Table thickness: .75' Static weight capacity of table (evenly distributed): 100 lbs. (leaf closed); 75 lbs. (leaf open) Stool overall dimensions: 11.5'W x 11.5'D x 20.8'H Stool leg footprint: 9.6'W x 9.6'D Static weight capacity for each stool: 200 lbs. Assembly required Ships in 1 box

EAN: 0021713233301

Package Dimensions: 33.0 x 28.0 x 9.0 inches

View full details

Limited Stocks Only...

Limited Stocks Only...

Limited Stocks Only...

Limited Stocks Only...

Limited Stocks Only...

Limited Stocks Only...

Limited Stocks Only...

Limited Stocks Only...

Limited Stocks Only...

Limited Stocks Only...

Limited Stocks Only...

Limited Stocks Only...

Limited Stocks Only...

Limited Stocks Only...

Limited Stocks Only...

Limited Stocks Only...